Căutare

Design, supply, installation, testing, and commissioning of a 230kV double circuit 102 km transmission line from Semera Substation (Ethiopia) to Galafi (Djibouti Border) (EXPIRED)

Cerere de oferte

Informaţii generale

Etiopia
   EEP/PP/ICB/02/2024
   Aprilie 11, 2025
Aprilie 30, 2025
Ethiopian Electric Power
   Engleză
   Achiziţie internaţională
   publicat: Aprilie 11, 2025

Informaţii de Contact

   Ethiopian Electric Power
Bireta Biret, Kotebe Addis Ababa, Ethiopia
Etiopia
   011-5-58-06-07

Bunuri, lucrări, servicii

Lucrări auxiliare pentru linii electrice Motoare, generatoare şi transformatoare electrice

Caietul de sarcini şi documente ataşate

 
  • (Aprilie 11, 2025)
     Descărca documente

Rezumat

      

notice_summary_english: Design, supply, installation, testing, and commissioning of a 230kV double circuit 102 km transmission line from Semera Substation (Ethiopia) to Galafi (Djibouti Border)
local_title: Design, supply, installation, testing, and commissioning of a 230kV double circuit 102 km transmission line from Semera Substation (Ethiopia) to Galafi (Djibouti Border)
notice_contract_type: Supply

Textul original


More information: Faceţi clic aici
Va rugam sa retineti ca acest anunt este doar pentru informarea dv.
Facem toate eforturile pentru a avea cele mai complete si actuale informatii pe acest website, dar nu putem garanta ca toate informatiile oferite sunt corecte.
Daca aveti sugestii pentru actualizari/corectii pentru acest anunt, va rugam sa ne informati.