Căutare

KAMPALA LIGHTING AND INFRASTRUCTURE IMPROVEMENT PROJECT (KCLIIP) (EXPIRED)

Cerere de oferte

Informaţii generale

Uganda
   KAMPALA
   KCCA/WORKS/KCLIIP/00001
   Mar 10, 2022
Aprilie 6, 2022
  
UGANDA - KAMPALA CAPITAL CITY AUTHORITY
   The Kampala Capital City Authority (KCCA) has applied for funding from Agence Française de Développement ("AFD") toward the cost of the KAMPALA LIGHTING AND INFRASTRUCTURE IMPROVEMENT PROJECT (KCLIIP), and it intends to use part of the funds for payment of the contract under Design, Build and Operate for SOLAR STREET LIGHTING ALONG THE ROADS AND ON THE SPECIFIC URBAN SPACES IN THE CAPITAL CITY.
The Employer intends to initially select a maximum of five (5) firms which will be issued the final Bidding document.
SUMMARY OF THE SCOPE OF WORKS
The project will cover the following;
• Supply and installation of autonomous solar street lighting units in Kampala along 290 km of roads of various widths,

• Providing good lighting on pedestrian routes along the sidewalks and 693 pedestrian crossings will need extra specific lighting accentuation for safety.

• Light accentuation will be brought to 160 specific road junctions. Luminaires with attractive design are expected on 10 outdoor markets.

• The contract covers also lighting of 6 taxi parks and specific locations in 13 informal setlements.

The works under the contract are broken down into 2 sections:
A. Section 1 (Firm order): 287 km of roads, 293 pedestrian crossings, 60 major junctions, 10 markets, 6 taxi parks, and 7 informal settlements
B. Section 2 (Optional order) : 200 pedestrian crossings, 100 major junctions, 3 markets, 3 taxi parks, 6 informal settlements
The contract does not specify the number of street lamps to install, since applicants will have the freedom to propose solutions with specific lumen output and spacing. But its numbers are estimated to 18, 000 units approximately.
The form of the contract will be a Design Build Operate (DBO) performance-based contract meaning that the applicants are expected to design the solutions to meet the technical specifications, to build foundations and install equipment, integrate a wireless central management system to be shared with the Employer, and offer a 10 years total warranty, including maintenance and replacement of components when needed (10 years from the first installed street light, 8 years from the last installed street light 2 years later).
The contractors will have to manage waste and recycle components in an effective and transparent way.
   Engleză
   Achiziţie internaţională
   publicat: Mar 10, 2022

Informaţii de Contact

   Doreen Akatuhwera
HEAD PDU
KAMPALA CAPITAL CITY AUTHORITY
APOLLO KAGWA ROAD
KAMPALA, KAMPALA 7010
Uganda
   + 25676100791
   Faceţi clic aici
   http://www.kcca.go.ug

Bunuri, lucrări, servicii

Caietul de sarcini şi documente ataşate

 
  • Solicitare (251 KB; Mar 10, 2022)
     Descărca documente

Textul original


More information: Faceţi clic aici
Va rugam sa retineti ca acest anunt este doar pentru informarea dv.
Facem toate eforturile pentru a avea cele mai complete si actuale informatii pe acest website, dar nu putem garanta ca toate informatiile oferite sunt corecte.
Daca aveti sugestii pentru actualizari/corectii pentru acest anunt, va rugam sa ne informati.