The Planned Action Consists Of Installing A Byp Between The Dalt And Baix Floor Of The Floor Of The Floor And The Floor, At The Height Of The Sanglas Alsina Square, To Have A Mesh The Network On The Low Manlleu And Install A Reducing Pressure Valve In This New Connection To Reduce The Pressure Of The Downstream Network. The Works To Be Executed Are Detailed In The Technical Project Of Ordinary Municipal Work Entitled "Regulation Of The Pressure Of The Network And Sectorization Of The System Of Supply Of The Municipality Of Manlleu".