Căutare

The Development Of A Secure Combined Passage At The Existing Crossroads On The Road To Thionville N3 (Rue Du Camping /Rue De Syren) Cr154. The Development Of 2 "Tray" Slowdowers With A Length Of 12M At The Ends Of The Existing Area 30 And The Implementation Of Suggestive Tracks On The Cr154 In Alzingen. The Development Of A Combined Passage The Exit From Hassel And Bus Stops Will Be Brought Up To Standards With Reduced Mobility. The Pc11 Will Be Developed Along The Cr162, Over A Length Of Around 130.00 Ml, On The South Side, Between The Exit From Hassel And The Existing Pc11. The Pilot Project Provides For The Speed Reduction On The Cr154 To 50 Km/H Between The Pr (0.50+118–3.50+490) Thus The Implementation Of 4 Constructive Provisions Allowing The Occasional Reduction In Automobile Speed And The Implementation Of A Colored Coating. The Treatment Of Contaminated Materials Of The Trunk As Well As The Implementation Of Recycled Materials.

Cerere de oferte

Informaţii generale

   Aprilie 27, 2025
   Franceză
   Altele
   publicat: Aprilie 27, 2025

Textul original

var consulation_ref='534210';
var organisme = 't5y';
var depotAutomatique = 0;
var pageTransmissionAffichee = 0;
var jetonSignatureMaxFileSize = 1048576;





Détail de la consultation










Date et heure limite de remise des plis :


11/06/2025 10:00












Référence :


2501039









Intitulé :


Aménagement de la PC11 entre...
Opţiuni de abonament

De bază

Complet

Corporate

$550 / an

$1000/an

Preț la cerere

Cumpăra Cumpăra Contactaţi-ne!
Va rugam sa retineti ca acest anunt este doar pentru informarea dv.
Facem toate eforturile pentru a avea cele mai complete si actuale informatii pe acest website, dar nu putem garanta ca toate informatiile oferite sunt corecte.
Daca aveti sugestii pentru actualizari/corectii pentru acest anunt, va rugam sa ne informati.